PRIME ENERGY USA on Chevron/Bechtel/Linde/GE Principal Engineering Technical Consultant $90B Houston, TX

PRIME ENERGY USA on Chevron/Bechtel/Linde/GE Principal Engineering Technical Consultant $90B Houston, TX

PRIME ENERGY USA on Chevron/Bechtel/Linde/GE Principal Engineering Technical Consultant $90B Houston, TX
(FPSO/SGS) off the Coast of AUSTRALIA and LNG Terminal Production Plant.
Experienced in NFPA, ABS, IEEE, NEC, ISA, API, PIP codes and standards.

Monitored equipment repair in the appropriate workshop, coordinate, track progress for repair and equipment delivery and ensured that work and equipment are delivered and tested in accordance with the design criteria, class rules, and governmental regulations, Company policies, customer expectation and standards and contract.

Detailed design of the electrical equipment installed in the cargo area and of the electrical bonding of the cargo tanks and piping and docks. 

A Materials Of Loading Facility (MOF), Product Loading Facility (PLF), shipping channel and turning basin Shiploader Electrical Installation Works and Commissioning was done on all the docks. Supported offshore and onshore pipelines and infrastructure  35 subsea production wells were drilled for the Project. Commissioned MUX subsea electro-hydraulic multiplex systems for BOP and subsea applications.

The Cognition monitoring system included

All measurements were accessible from any single connection point, implementing an unprecedented level of redundancy.

Designed the 3-D model using Aveva E3D ISA for field instrument orientation check to ensure all field devices will work and operating and maintenance access is provided. Designed and installed Advanced Regulatory Control (ARC) or DCS complex loop controls Fuel Gas Stripper, Deethanizer, Depropanizer, Debutanizer, Depentanizer/Dehexanizer, Propane Refrigeration Cycle, Fractionation units and implemented Multivariable DMC loops on the above units as well.

EXTENSIVE LOCKOUT/TAGOUT Experience

LNG Participate in engineering and process safety reviews; HAZIDs and HAZOPs, Participated and facilitated of Functional Safety Assessment, LOPA/SIL Assignment. Deep Knowledge and understanding of all electrical codes on this project  IEC, NEC, DNV, NFPA and ABS codes.

VPP rated OSHA Project

Commissioned all 16 40MW GE CCGT with DLE technology. Extensive application programming experience with the following GE Mark VII ToolboxST, TMR Control system.T rend Recorder, Dynamic Data Recorders, Watch Windows, and dynamic “rung” display. HMI used was Wonderware, TCI, WorkstationST plus all the controllers communicated via OPC or IONE, EXTENSIVE CCTV and OSI PI SME Interfaced the AB1750 package with YOKOGAWA VP DCS  using RSVIEW and OPC All design drawing were done using SPI INTOOLS and SEE and AutoCad.

Extensive Substation design and commissioning Electrical Installations.
Electrical one-line diagrams.
Excellent understanding and knowledge of Electrical Distribution Systems at Low (480V).
Designed and commissioned one-lines, three-lines, control schematics, wiring diagrams, relay panel arrangements, and cable lists for high voltage (69-500KVA).

Let’s Discuss Your Project with Our Experts.